2030 Proposed Rapid Bus (28)
2030 Proposed Street Car (29)
2030 Proposed Bus Rapid Transit (30)
ProTrack Project Initiation Point (135)
| Not-Selected |
| Selected |
ProTrack Project Point (136)
| Pending Award |
| Pending NTP |
| Under Construction |
| Under Design |
| Under Planning |
| Under Study |
| Substantially Complete |
| Completed |
ProTrack Project Initiation Line (137)
| Not-Selected |
| Selected |
ProTrack Project Line (138)
| Pending Award |
| Pending NTP |
| Under Construction |
| Under Design |
| Under Planning |
| Under Study |
| Substantially Complete |
| Completed |
ProTrack Project Initiation Polygon (139)
| Not-Selected |
| Selected |
ProTrack Project Polygon (140)
| Pending Award |
| Pending NTP |
| Under Construction |
| Under Design |
| Under Planning |
| Under Study |
| Substantially Complete |
| Completed |
Transportation Study Areas (31)
| Bicycle Study |
| Environmental Assessment |
| Streetscape Study |
| Traffic Calming Study |
| Transportation Study |
| None Entered |
Sidewalk Condition Assessment (0)
| Excellent |
| Good |
| Fair |
| Poor |
| Failed |
| N/A |
Markings Condition Assessment - White Lines (1)
| Excellent |
| Very Good |
| Good |
| Fair |
| Poor |
| No Data/Not Striped/Inaccessible |
Markings Condition Assessment - Yellow Lines (2)
| Excellent |
| Very Good |
| Good |
| Fair |
| Poor |
| No Data/Not Striped/Inaccessible |
Alley Condition Assessment (3)
|